Installation procedure of welding rotator

The installation and debugging of the welding rotator is the prerequisite to ensure the good performance and reliability of the equipment.

1, the equipment must be well installed before the foundation of the equipment, to ensure the normal maintenance period of the soil, to ensure that the installation of equipment at the same level on the line.

2, equipment installation, according to general equipment installation requirements of equipment installation, fixed, can use expansion bolt fixed. When installing, the two sets of rollers must be placed in parallel, in which the heart should be consistent and the integrity of the parts of the equipment must be ensured.

3, after the equipment is installed, check whether the parts of the equipment meet the assembly requirements, and ensure the electrical wiring of each part of the normal, check and clean the peripheral equipment, to ensure that there is no obstacle to the normal operation of equipment.

We can also supply the high quality straight cutting machine, auto welding positioner etc. If you need, welcome to contact us.

welding rotator

Wuxi OLIVET Machinery Equipment Co.,LTD.E-mail: sales@chinaolivet.cnTel: +86-510-8383 0908

Home About UsProductsQuality ControlCompany NewsContact Us Sitemap

Copyright©2015 Wuxi OLIVET Machinery Equipment Co.,Ltd. Technical Support: Reanod

Follow Us